Construction of Health and Education Facilities(CHEF)

Speeches Shim

OVERVIEW

The Construction of Health and Education Facilities (CHEF) project addresses the medical needs of more than two million Afghan citizens through the construction of two new hospitals, a 100-bed hospital in Gardez, and a 20 bed hospital in Paktika.  Additionally over 1 million Afghan citizens will benefit from the construction of three provincial midwife training centers in Faizabad, Khost, and Bamiyan. These health facilities will support the Ministry of Public Health in its efforts to provide urgently needed health services, including in-patient and out-patient referral and treatment.  The hospitals will also serve as training facilities for health professionals, as well as venues for medical conferences and seminars.  The education component of the CHEF project, through construction of four Provincial Teacher Training Centers (PTTC), aims to address the following teacher training goals identified by the Ministry of Education: 1) providing the proper infrastructure needed to educate trainers of teachers and teachers themselves; 2) strengthening the educational requirements of the country; and 3) increasing the quality and number of teachers.  Target PTTC’s are located in Wardak, Faryab, Nangarhar, and Parwan provinces.

ACTIVITIES

Health facilities being constructed under the CHEF Program:

S.No

Health Facility

Location

IP

Status

1

100-bed Hospital Gardez

Gardez

IOM

Ongoing at 68%

2

20-Bed Hospital Khair Kote

Khair Kote Paktika

IOM

Ongoing at 83%

3

Midwife Training center (MTC) Khost

Khost

IOM

Completed

4

Midwife Training center (MTC) Bamyan

Bamyan

IOM

Ongoing at 93.16%

5

Midwife Training center (MTC) Faizabad

 

IOM

Ongoing at 95%

6

Refurbishment of Antani Hospital

Kabul

IOM

Completed

7

Refurbishment of Qawchin Clinic

Jawzjan

IOM

Completed

Education facilities being constructed under CHEF Program:

S.No

Health Facility

Location

IP

Status

1

PTTC Nangarhar

Jalal Abad

IOM

Completed

2

PTTC Faryab

Maimana

IOM

Ongoing at 98.6%

3

PTTC Parwan

Charikar

IOM

Ongoing at 95.92%

4

PTTC Wardak

Maidan Shahr

IOM

Ongoing at 99%

5

PTTC Khost Boundary Wall and Water Well.

Khost

IOM

Completed

6

Sherzad High School

Nangarhar

IOM

Completed

Accomplishments

The following facilities have been completed:

  • MTC Khost completed and handed over to the Ministry of Public Health.
  • PTTC Khost boundary wall and water well completed and handed over to the Ministry of Education.
  • PTTC Nangarhar substantial completion inspection (SCI), completed handed over to the Ministry of Education.
  • Sherzad School completed and handed over to the Ministry of Education.
  • Qawchin Clinic refurbishment completed and handed over to the Ministry of Public Health.
  • Parwan PTTC water tower completed.
  • PTTC Wardak, PTTC Faryab, MTC Bamyan, and MTC Faizabad read for SCI by the end of December 2012.