The Construction of Health and Education Facilities (CHEF) project addresses the medical needs of more than two million Afghan citizens through the construction of two new hospitals, a 100-bed hospital in Gardez, and a 20 bed hospital in Paktika. Additionally over 1 million Afghan citizens will benefit from the construction of three provincial midwife training centers in Faizabad, Khost, and Bamiyan. These health facilities will support the Ministry of Public Health in its efforts to provide urgently needed health services, including in-patient and out-patient referral and treatment. The hospitals will also serve as training facilities for health professionals, as well as venues for medical conferences and seminars. The education component of the CHEF project, through construction of four Provincial Teacher Training Centers (PTTC), aims to address the following teacher training goals identified by the Ministry of Education: 1) providing the proper infrastructure needed to educate trainers of teachers and teachers themselves; 2) strengthening the educational requirements of the country; and 3) increasing the quality and number of teachers. Target PTTC’s are located in Wardak, Faryab, Nangarhar, and Parwan provinces.
ACTIVITIES
Health facilities being constructed under the CHEF Program:
S.No |
Health Facility |
Location |
IP |
Status |
1 |
100-bed Hospital Gardez |
Gardez |
IOM |
Ongoing at 68% |
2 |
20-Bed Hospital Khair Kote |
Khair Kote Paktika |
IOM |
Ongoing at 83% |
3 |
Midwife Training center (MTC) Khost |
Khost |
IOM |
Completed |
4 |
Midwife Training center (MTC) Bamyan |
Bamyan |
IOM |
Ongoing at 93.16% |
5 |
Midwife Training center (MTC) Faizabad |
|
IOM |
Ongoing at 95% |
6 |
Refurbishment of Antani Hospital |
Kabul |
IOM |
Completed |
7 |
Refurbishment of Qawchin Clinic |
Jawzjan |
IOM |
Completed |
Education facilities being constructed under CHEF Program:
S.No |
Health Facility |
Location |
IP |
Status |
1 |
PTTC Nangarhar |
Jalal Abad |
IOM |
Completed |
2 |
PTTC Faryab |
Maimana |
IOM |
Ongoing at 98.6% |
3 |
PTTC Parwan |
Charikar |
IOM |
Ongoing at 95.92% |
4 |
PTTC Wardak |
Maidan Shahr |
IOM |
Ongoing at 99% |
5 |
PTTC Khost Boundary Wall and Water Well. |
Khost |
IOM |
Completed |
6 |
Sherzad High School |
Nangarhar |
IOM |
Completed |
Accomplishments
The following facilities have been completed:
- MTC Khost completed and handed over to the Ministry of Public Health.
- PTTC Khost boundary wall and water well completed and handed over to the Ministry of Education.
- PTTC Nangarhar substantial completion inspection (SCI), completed handed over to the Ministry of Education.
- Sherzad School completed and handed over to the Ministry of Education.
- Qawchin Clinic refurbishment completed and handed over to the Ministry of Public Health.
- Parwan PTTC water tower completed.
- PTTC Wardak, PTTC Faryab, MTC Bamyan, and MTC Faizabad read for SCI by the end of December 2012.